The team treated a mid terrace in Sheffield for rising damp. This included removal of plaster to brick, installation of a chemical DPC, mechanically fixing cavity drain membrane and dry-lining. The walls will then be plastered leaving a finish ready for decoration. The photo shows the membrane stage.
Rising damp treatment in Sheffield
