New Build Basement Conversion Project

Insulating Concrete Formwork (ICF) build off a RC raft for a new build basement in Sheffield

  • Type A: Barrier Protection – external waterproofing
  • Type C: Drained Protection – internal waterproofing

Incorporating Delta Dual Proof pre-applied water proofing membrane prior to pouring the concrete slab over the formwork system.

Primary resistance of the structure is provided by Koster Deuxan-2C polymer modified thick bitumen compound bitumen-based waterproofing on the positive side.  Once the Deuxan has cured Delta-GeoDrain Quattro membrane is mechanically installed with joints overlapped and sealed.  Finally, 8mm cavity drainage membrane to be installed on all walls.

By choosing Damptec for your new build basement needs in Sheffield, you ensure a professionally managed project with robust, reliable waterproofing solutions.

Contact us today for more information and to discuss your project requirements.

Previous Post

Basement conversion: garage converted to habitable space

Next Post

Pump and sump system

Leave a Reply

Scroll to top