Insulating Concrete Formwork (ICF) build off a RC raft for a new build in Sheffield

  • Type A: Barrier Protection – external waterproofing
  • Type C: Drained Protection – internal waterproofing

Incorporating Delta Dual Proof pre-applied water proofing membrane prior to pouring the concrete slab over the formwork system.

Primary resistance of the structure is provided by Koster Deuxan-2C polymer modified thick bitumen compound bitumen-based waterproofing on the positive side.  Once the Deuxan has cured Delta-GeoDrain Quattro membrane is mechanically installed with joints overlapped and sealed.  Finally, 8mm cavity drainage membrane to be installed on all walls.

Previous Post

Basement garage converted to habitable space

Next Post

Pump and sump system