Our team worked on a formerly damp basement in Matlock Derbyshire which is being converted for use as a gym. The walls have now been membraned and a sump and pump has been installed to manage any future water ingress. Today the Weyroc floating floor goes down. Next week we start on the metal framework prior to dry-lining and insulating.