Our client was based in Leicester and contacted us to fix issues with a flooding new build lift pit in October 2026.
Once on site our inspection revealed there was no land drain which was allowing the floor void to fill with water under hydrostatic pressure. We drilled a hole in the lift pit wall and the pit immediately began to fill with free water as can be seen in the video above.
We produced a specification agreed by the client and our team arrived on site shortly after to carry out the work.
Waterstop was used to plug the drill hole and the water was pumped out (see photo above).
Our specification combined use of resin injection using Koster 2 in 1 Crack Injection System directly into the masonry on the negative side. This was followed by Type A barrier protection using the Koster KD System. The final photo shows the result with water ingress into the lift pit fully resolved